METINVEST HOLDING LLC. CENTRAL GOK PJSC. Adjustment of the main technological indicators for the crushing and enrichment complex in connection with the involvement of ores from SOUTHERN GOK PJSC in processing | Scientific and Research Work, Schematic Design | Jan-24 | in progress |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing plant. Reconstruction of the pelletizing section with the installation of a new pelletizing disk. | Detail engineering | May-23 | in progress |
СMK LLC. Development of technical regulations for ore enrichment technology K2/5 FERREXPO POLTAVA MINING at the enrichment plant of СMK LLC | Technical Regulation | Mar-23 | Dec-23 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Adjustment of main process indicators of Ore Treatment Plant No.1 | Schematic Design | Jan-23 | Aug-23 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Adjustment of main process indicators for the crushing and enrichment complex. Increase in production of concentrate for DRI pellets with SiO2 content not exceeding 2.8% | Scientific and Research Work, Developed Design | Oct-22 | Mar-23 |
FERREXPO POLTAVA MINING. New construction of flue gas cleaning system for process line No.2 of the pellet production unit | Detail engineering | Apr-22 | Dec-22 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Development of the technological scheme of ore enrichment at sections No.14-17 with partial output of the industrial product at section No.18 | Scientific and Research Work, Detail engineering | Jul-21 | Dec-21 |
FERREXPO POLTAVA MINING. Technical re-equipment of the burnt pellet shipment section to increase productivity from 12 to 24 million tons/year | Detail engineering | May-21 | Oct-23 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Reconstruction of the Crushing and Enrichment Plant. Implementation of the technology of gross processing of raw materials using press rolls by dry and wet magnetic separation method | Technical Regulation | Nov-21 | Dec-22 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Crushing plant. Dry magnetic separation building. Reconstruction of the Dry Magnetic Separation section in terms of replacement of separators | Scientific and Research Work, Detail engineering | Jul-21 | Dec-21 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Construction of a complex for flotation finishing of magnetite iron ore concentrate with productivity of 10.0 mln tons/year | Schematic Design | Aug-20 | Dec-21 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Reconstruction of the heat engineering system of the LURGI 552-B burning machine. | Schematic Design, Detailed engineering | Feb-21 | Dec-22 |
METINVEST HOLDING LLC. INGULETSKIY GOK PJSC. Finishing of foam product of OPU of MFO Ore Enrichment Plant No. 2. Reconstruction. | Feasibility Study | Mar-21 | Dec-21 |
FERREXPO POLTAVA MINING. Pellet production unit. Reconstruction of process line No.4 to increase capacity from 3.0 to 6.0+ million tons of iron ore pellets per year. | Schematic Design, Detailed engineering | Apr-21 | Mar-22 |
FERREXPO POLTAVA MINING. Reconstruction of mill path No.3 of the charge section of the pellet production shop to increase production capacity to 24 million tons/year. | Schematic Design, Detailed engineering | Apr-21 | Dec-21 |
FERREXPO POLTAVA MINING. Reconstruction of the integral property complex of the Pellet Preparation Unit in the part of the building of the filtration and concentrate averaging building of the Pellet Preparation Unit No.1, A and No.2, B in axes 1-5 from axis 73 and 50. Technological line No.1, No.2, No.3, No.4. | Detail engineering | Aug-20 | Feb-21 |
FERREXPO POLTAVA MINING. New construction of the grinding unit of grinding section No.9 of the main production section No.2 of the crushing and enrichment plant. | Technical Regulation, Detail engineering | Sep-20 | Feb-21 |
FERREXPO POLTAVA MINING. New construction of the grinding unit of the main production section No.4 of the crushing and beneficiation plant | Technical Regulation, Schematic Design, Detail documentation | Mar-21 | in progress |
FERREXPO POLTAVA MINING. New construction of the grinding unit of the main production section No.2 of the crushing and beneficiation plant | Technical Regulation, Schematic Design, Detailed engineering | Mar-21 | in progress |
FERREXPO POLTAVA MINING. Technical re-equipment of the flue gas purification system at the burning section No.1 and No.2. Technological line No.1, No.3, No.4 | Detail engineering | Aug-20 | Nov-20 |
FERREXPO POLTAVA MINING. Technical re-equipment of the fine screening department in sections No.10-15 in the building of the enrichment building with concentrate storage No.2 of the crushing and enrichment plant. Development of documentation for sections No.10-11 | Detail engineering | Jul-20 | Oct-20 |
FERREXPO POLTAVA MINING. New construction of the first stage ore crushing complex. Engineering | Feasibility Study | Nov-19 | Aug-20 |
FERREXPO POLTAVA MINING. Technical re-equipment of the permitting wall of the ring cooler of the burning section in order to improve the quality of cooling of fired iron ore pellets. Pellet Preparation Unit. Technological line No.2 | Detail engineering | Aug-19 | Oct-19 |
FERREXPO POLTAVA MINING. Construction of screening areas for annealed iron ore pellets at shipping routes No.1 and No.2. Pellet Preparation Unit. | Feasibility Study | Jul-19 | Dec-19 |
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration building | Detail documentation | Feb-19 | Apr-19 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.4. Pelletizing building. Reconstruction in order to increase productivity from 3.0 to 6.5 mln. tons/year by finished pellets. (with additional ToR in the process of design) | Feasibility Study, Schematic Design, Detailed engineering | Apr-19 | Jan-24 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.2. Replacement of smoke exhauster with reconstruction of gas flow scheme | Survey of building structures, Detail engineering | Dec-18 | May-19 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1. Reconstruction to increase productivity from 3.0 to 4.1 million tons/year by finished pellets. | Feasibility Study | Jan-19 | Jul-19 |
FERREXPO POLTAVA MINING. Technical re-equipment of the magnetic separation stage at the process sections of the Ore Enrichment Plant No.1 | Feasibility Study | Jan-19 | Jul-19 |
FERREXPO POLTAVA MINING. Installation of XR-400 pumps (2 pcs.) for pumping tailings of the 1st flotation pre-crushing section of the Crushing and Concentrating Plant No.2 to the tailings ditch of Crushing and Concentrating Plant No.1 | Detail documentation | Jan-19 | Jul-19 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Reconstruction of the process line for production of concentrate for DRI pellets | Schematic Design, Detailed engineering | Sep-18 | Apr-19 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Increase of iron content in concentrate using flotation finishing technology at NORTHERN GOK PJSC in order to achieve a mass fraction of total iron in magnetite concentrate not less than 69.0% | Feasibility Study | Jan-19 | Sep-19 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Update of design documentation of ore enrichment plant No.1 | Schematic Design | Oct-18 | Apr-19 |
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Development of software for calculation of material stockpile of charge materials in the production of pellets for burning machines. | Scientific and Research Work | Sep-18 | Nov-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Installation of the girder pendulum beam on the drum pelletizer. | Detail engineering | Oct-18 | Nov-18 |
FERREXPO POLTAVA MINING. Construction of the press filtration building. Relocation of drainage pumps from the press-filtration building construction area | Detail documentation | Aug-18 | Nov-18 |
FERREXPO POLTAVA MINING. Laboratory and pilot tests on pelletizing of Premium and Premium+ concentrates at the research laboratory of HAVER Engineering GmbH | Scientific and Research Work | Apr-18 | Aug-18 |
METINVEST HOLDING LLC. INGULETSKIY GOK PJSC. Crushing plant. Building of the 3-4 stage of crushing. Reconstruction of oil lubrication section | Detail engineering | Apr-18 | Sep-18 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing Plant. Installation of a SCARABAEUS 7500 pelletizing disk to replace the existing one at process line No. 74 | Detail engineering | Jul-18 | Sep-18 |
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing Plant. Reconstruction of the burnt pellets sorting section to eliminate +16.0 mm grade from finished pellets | Detail engineering | Jul-18 | Aug-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1. Reconstruction to increase productivity from 3.0 to 6.5 million tons/year of finished pellets | Feasibility Study | Aug-18 | Feb-19 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.2. Installation of leveling wall with replacement of smoke exhauster and its piping | Detail engineering | May-18 | Jul-18 |
FERREXPO POLTAVA MINING. Section No. 9. Electricity supply 6 kV | Detail documentation | May-18 | Aug-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration building. Calculation of short-circuit currents and settings | Detail engineering | Apr-18 | Jul-18 |
State enterprise "Kryvyi Rih international airport". Installation of block transformer station 6/0.4 kV | Detail engineering | Jan-18 | Mar-18 |
Rudomain LLC (Kryvyi Rih). Development of technological regulations for enrichment of hematite quartzites from the Kirov mine (Artyom mine field) using dry magnetic separation technology to obtain commercial products | Laboratory Research, Scientific and Research Work | Dec-17 | Feb-18 |
Dnipro-Kirovograd (Regional Communal Production Enterprise). Reconstruction of sewage pumping stations (20 objects) | Schematic Design, Detailed engineering, Authorial Supervision | Nov-17 | Oct-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration building with productivity of 28.6 mln tons/year of dewatered concentrate and charge preparation area | Feasibility Study, Schematic Design, Detailed engineering | Sep-17 | Sep-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Reconstruction of the pelletizing section to ensure industrial studies of a 7.5 m diameter pelletizing disk | PreSchematic Design | Dec-17 | Jan-18 |
FERREXPO POLTAVA MINING. Pelletizing plant. Process line No.1 Installation of an additional crane | PreSchematic Design | Jul-17 | Jul-17 |
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1 and No. 4. Reconstruction of the pelletizing section to increase productivity up to 6.5 mln tons/year in terms of finished pellets | PreSchematic Design | Jul-17 | Jul-17 |
Shimanovskoye Steel LLC. Analytical review of the possibility of processing ores of Shimanovskoye mine at Ukrainian mining and enrichment plants | Scientific and Research Work | Apr-17 | Apr-17 |
FERREXPO POLTAVA MINING. Enrichment Plant No.2. Construction of section No.16. Capacity of 5.6 million tonnes per annum of feed ore | Technical Regulation, Feasibility Study | Mar-17 | Oct-17 |
Rudomain LLC (Kryvyi Rih).Development of technological regulations for enrichment of substandard ores of the Kryvyi Rih iron ore basin | Scientific and Research Work | Feb-17 | Feb-17 |
State enterprise "Boryspil international airport". Reconstruction of tanks VST-1000 No.1,2,3 and RVS-2000 # 4 and # 5 | Authorial Supervision | Sep-16 | Dec-16 |
ERG. SSGP JSC (Kazakhstan). Development of technology and technological solutions for the reconstruction of the Beneficiation plant with a capacity of 45 million tons / year | PreFeasibility Study, 3D model plant | Aug-16 | Oct-16 |