References of SPA RAKURS LLC:

OBJECTSTAGESTARTEND
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Adjustment of the main technological indicators for the crushing and enrichment complex in connection with the involvement of ores from SOUTHERN GOK PJSC in processingScientific and Research Work, Schematic DesignJan-24in progress
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing plant. Reconstruction of the pelletizing section with the installation of a new pelletizing disk.Detail engineeringMay-23in progress
СMK LLC. Development of technical regulations for ore enrichment technology K2/5 FERREXPO POLTAVA MINING at the enrichment plant of СMK LLCTechnical RegulationMar-23Dec-23
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Adjustment of main process indicators of Ore Treatment Plant No.1Schematic DesignJan-23Aug-23
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Adjustment of main process indicators for the crushing and enrichment complex. Increase in production of concentrate for DRI pellets with SiO2 content not exceeding 2.8%Scientific and Research Work, Developed DesignOct-22Mar-23
FERREXPO POLTAVA MINING. New construction of flue gas cleaning system for process line No.2 of the pellet production unitDetail engineeringApr-22Dec-22
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Development of the technological scheme of ore enrichment at sections No.14-17 with partial output of the industrial product at section No.18Scientific and Research Work, Detail engineeringJul-21Dec-21
FERREXPO POLTAVA MINING. Technical re-equipment of the burnt pellet shipment section to increase productivity from 12 to 24 million tons/yearDetail engineeringMay-21Oct-23
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Reconstruction of the Crushing and Enrichment Plant. Implementation of the technology of gross processing of raw materials using press rolls by dry and wet magnetic separation methodTechnical RegulationNov-21Dec-22
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Crushing plant. Dry magnetic separation building. Reconstruction of the Dry Magnetic Separation section in terms of replacement of separatorsScientific and Research Work, Detail engineeringJul-21Dec-21
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Construction of a complex for flotation finishing of magnetite iron ore concentrate with productivity of 10.0 mln tons/yearSchematic DesignAug-20Dec-21
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Reconstruction of the heat engineering system of the LURGI 552-B burning machine.Schematic Design, Detailed engineeringFeb-21Dec-22
METINVEST HOLDING LLC. INGULETSKIY GOK PJSC. Finishing of foam product of OPU of MFO Ore Enrichment Plant No. 2. Reconstruction.Feasibility StudyMar-21Dec-21
FERREXPO POLTAVA MINING. Pellet production unit. Reconstruction of process line No.4 to increase capacity from 3.0 to 6.0+ million tons of iron ore pellets per year.Schematic Design, Detailed engineeringApr-21Mar-22
FERREXPO POLTAVA MINING. Reconstruction of mill path No.3 of the charge section of the pellet production shop to increase production capacity to 24 million tons/year.Schematic Design, Detailed engineeringApr-21Dec-21
FERREXPO POLTAVA MINING. Reconstruction of the integral property complex of the Pellet Preparation Unit in the part of the building of the filtration and concentrate averaging building of the Pellet Preparation Unit No.1, A and No.2, B in axes 1-5 from axis 73 and 50. Technological line No.1, No.2, No.3, No.4.Detail engineeringAug-20Feb-21
FERREXPO POLTAVA MINING. New construction of the grinding unit of grinding section No.9 of the main production section No.2 of the crushing and enrichment plant.Technical Regulation, Detail engineeringSep-20Feb-21
FERREXPO POLTAVA MINING. New construction of the grinding unit of the main production section No.4 of the crushing and beneficiation plantTechnical Regulation, Schematic Design, Detail documentationMar-21in progress
FERREXPO POLTAVA MINING. New construction of the grinding unit of the main production section No.2 of the crushing and beneficiation plantTechnical Regulation, Schematic Design, Detailed engineeringMar-21in progress
FERREXPO POLTAVA MINING. Technical re-equipment of the flue gas purification system at the burning section No.1 and No.2. Technological line No.1, No.3, No.4Detail engineeringAug-20Nov-20
FERREXPO POLTAVA MINING. Technical re-equipment of the fine screening department in sections No.10-15 in the building of the enrichment building with concentrate storage No.2 of the crushing and enrichment plant. Development of documentation for sections No.10-11Detail engineeringJul-20Oct-20
FERREXPO POLTAVA MINING. New construction of the first stage ore crushing complex. EngineeringFeasibility StudyNov-19Aug-20
FERREXPO POLTAVA MINING. Technical re-equipment of the permitting wall of the ring cooler of the burning section in order to improve the quality of cooling of fired iron ore pellets. Pellet Preparation Unit. Technological line No.2Detail engineeringAug-19Oct-19
FERREXPO POLTAVA MINING. Construction of screening areas for annealed iron ore pellets at shipping routes No.1 and No.2. Pellet Preparation Unit.Feasibility StudyJul-19Dec-19
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration buildingDetail documentationFeb-19Apr-19
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.4. Pelletizing building. Reconstruction in order to increase productivity from 3.0 to 6.5 mln. tons/year by finished pellets. (with additional ToR in the process of design)Feasibility Study, Schematic Design, Detailed engineeringApr-19Jan-24
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.2. Replacement of smoke exhauster with reconstruction of gas flow schemeSurvey of building structures, Detail engineeringDec-18May-19
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1. Reconstruction to increase productivity from 3.0 to 4.1 million tons/year by finished pellets.Feasibility StudyJan-19Jul-19
FERREXPO POLTAVA MINING. Technical re-equipment of the magnetic separation stage at the process sections of the Ore Enrichment Plant No.1Feasibility StudyJan-19Jul-19
FERREXPO POLTAVA MINING. Installation of XR-400 pumps (2 pcs.) for pumping tailings of the 1st flotation pre-crushing section of the Crushing and Concentrating Plant No.2 to the tailings ditch of Crushing and Concentrating Plant No.1Detail documentationJan-19Jul-19
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Reconstruction of the process line for production of concentrate for DRI pelletsSchematic Design, Detailed engineeringSep-18Apr-19
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Increase of iron content in concentrate using flotation finishing technology at NORTHERN GOK PJSC in order to achieve a mass fraction of total iron in magnetite concentrate not less than 69.0%Feasibility StudyJan-19Sep-19
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Update of design documentation of ore enrichment plant No.1Schematic DesignOct-18Apr-19
METINVEST HOLDING LLC. NORTHERN GOK PJSC. Development of software for calculation of material stockpile of charge materials in the production of pellets for burning machines.Scientific and Research WorkSep-18Nov-18
FERREXPO POLTAVA MINING. Pelletizing plant. Installation of the girder pendulum beam on the drum pelletizer.Detail engineeringOct-18Nov-18
FERREXPO POLTAVA MINING. Construction of the press filtration building. Relocation of drainage pumps from the press-filtration building construction areaDetail documentationAug-18Nov-18
FERREXPO POLTAVA MINING. Laboratory and pilot tests on pelletizing of Premium and Premium+ concentrates at the research laboratory of HAVER Engineering GmbHScientific and Research WorkApr-18Aug-18
METINVEST HOLDING LLC. INGULETSKIY GOK PJSC. Crushing plant. Building of the 3-4 stage of crushing. Reconstruction of oil lubrication sectionDetail engineeringApr-18Sep-18
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing Plant. Installation of a SCARABAEUS 7500 pelletizing disk to replace the existing one at process line No. 74Detail engineeringJul-18Sep-18
METINVEST HOLDING LLC. CENTRAL GOK PJSC. Pelletizing Plant. Reconstruction of the burnt pellets sorting section to eliminate +16.0 mm grade from finished pelletsDetail engineeringJul-18Aug-18
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1. Reconstruction to increase productivity from 3.0 to 6.5 million tons/year of finished pelletsFeasibility StudyAug-18Feb-19
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.2. Installation of leveling wall with replacement of smoke exhauster and its pipingDetail engineeringMay-18Jul-18
FERREXPO POLTAVA MINING. Section No. 9. Electricity supply 6 kVDetail documentationMay-18Aug-18
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration building. Calculation of short-circuit currents and settingsDetail engineeringApr-18Jul-18
State enterprise "Kryvyi Rih international airport". Installation of block transformer station 6/0.4 kVDetail engineeringJan-18Mar-18
Rudomain LLC (Kryvyi Rih). Development of technological regulations for enrichment of hematite quartzites from the Kirov mine (Artyom mine field) using dry magnetic separation technology to obtain commercial productsLaboratory Research, Scientific and Research WorkDec-17Feb-18
Dnipro-Kirovograd (Regional Communal Production Enterprise). Reconstruction of sewage pumping stations (20 objects)Schematic Design, Detailed engineering, Authorial SupervisionNov-17Oct-18
FERREXPO POLTAVA MINING. Pelletizing plant. Construction of press filtration building with productivity of 28.6 mln tons/year of dewatered concentrate and charge preparation areaFeasibility Study, Schematic Design, Detailed engineeringSep-17Sep-18
FERREXPO POLTAVA MINING. Pelletizing plant. Reconstruction of the pelletizing section to ensure industrial studies of a 7.5 m diameter pelletizing diskPreSchematic DesignDec-17Jan-18
FERREXPO POLTAVA MINING. Pelletizing plant. Process line No.1 Installation of an additional cranePreSchematic DesignJul-17Jul-17
FERREXPO POLTAVA MINING. Pelletizing plant. Technological line No.1 and No. 4. Reconstruction of the pelletizing section to increase productivity up to 6.5 mln tons/year in terms of finished pelletsPreSchematic DesignJul-17Jul-17
Shimanovskoye Steel LLC. Analytical review of the possibility of processing ores of Shimanovskoye mine at Ukrainian mining and enrichment plantsScientific and Research WorkApr-17Apr-17
FERREXPO POLTAVA MINING. Enrichment Plant No.2. Construction of section No.16. Capacity of 5.6 million tonnes per annum of feed oreTechnical Regulation, Feasibility StudyMar-17Oct-17
Rudomain LLC (Kryvyi Rih).Development of technological regulations for enrichment of substandard ores of the Kryvyi Rih iron ore basinScientific and Research WorkFeb-17Feb-17
State enterprise "Boryspil international airport". Reconstruction of tanks VST-1000 No.1,2,3 and RVS-2000 # 4 and # 5Authorial SupervisionSep-16Dec-16
ERG. SSGP JSC (Kazakhstan). Development of technology and technological solutions for the reconstruction of the Beneficiation plant with a capacity of 45 million tons / yearPreFeasibility Study, 3D model plantAug-16Oct-16