Object name

Stage

Beginning

Ending

Ferrexpo Poltava Mining PJSC. Technical re-equipment of the fine screening department on sections No.10-15 in the building of the beneficiation building with the storage of concentrate No.2 of the crushing and beneficiation factory. Installation of fine screening screens on sections No.10-11.

Detail Engineering

05.2020

09.2020

Ferrexpo Poltava Mining PJSC. Technical re-equipment of the magnetic separation stage at technological sections of Beneficiating Factory No1. Provision of technical water and tailings removal during the restoration of the first stage of magnetic separation with a simultaneous increase in production capacity for processing source ore.

Feasibility Study

03.2020

06.2020

Ferrexpo Poltava Mining PJSC. New construction of the complex of the first stage of ore crushing. The major crushing complex (MCC-3).

Feasibility Study

11.2019

02.2020

Zaporizhzhya Iron Ore Plant PJSC. Installation of an oil lubrication system for mills in the laying area.

Final Documents

10.2019

12.2019

Zaporizhzhya Iron Ore Plant PJSC. Installation of an oil lubrication system for conveyors No.90 and No.94.

Final Documents

10.2019

12.2019

Central GOK PJSC. Correction of the main technological indicators for the crushing and beneficiating complex.

Scientific Research

09.2019

11.2019

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Technological line No. 2. Installation of a leveling wall with the replacement of the smoke exhaust and its piping.

Detail Engineering

08.2019

10.2019

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Reconstruction of the loading hopper.

Detail Engineering

08.2019

12.2019

Ferrexpo Poltava Mining PJSC. The construction of sections for screening fired iron ore pellets on the shipment paths No. 1 and No. 2.

Feasibility Study

08.2019

11.2019

Ferrexpo Poltava Mining PJSC. Reconstruction of the administrative building.

Basic Engineering and Final Documents

08.2019

03.2020

Ferrexpo Poltava Mining PJSC. Pellet Production Workshop. Construction of a new pelletizing building for the production line No. 4.

Basic Engineering and Final Documents

07.2019

12.2020

Central GOK PJSC. Automated process control system for the production of concentrate on the beneficiating factory for DRI technology. The upper level of the process control system.

Final Documents

07.2019

11.2019

Ingulets GOK PJSC. Beneficiating Factory No. 2. Installation of hydrocyclones of the Multotec company.

Detail Engineering

06.2019

09.2019

Ferrexpo Poltava Mining PJSC. Mining workshop. Technical re-equipment of the sound alarm system of imploding works.

Detail Engineering

08.2019

11.2019

Ferrexpo Poltava Mining PJSC. Pellet Production Workshop. Construction of a new pelletizing building for the production line No. 1.

Basic Engineering and Final Documents

06.2019

11.2020

Ferrexpo Poltava Mining PJSC. Pellet Production Workshop. Reconstruction of a pelletizing site to ensure industrial testing of a pelletizing disc with a diameter of 7.5 m using a buffer tank building.

Basic Engineering and Final Documents

06.2019

12.2019

Northern GOK PJSC. Development of monitoring tools to improve the quality of electric energy in the networks of the enterprise.

Scientific Research, Detail Engineering

02.2019

05.2019

Development and implementation of rational scientific, technical and design solutions to reduce the enterprise's fee for reactive power and minimize losses in the power supply networks of networks and substations.

Scientific Research

06.2019

09.2019

Ferrexpo Poltava Mining PJSC. Installation of XR-400 pumps (2 pcs.) For transferring the tailings of the regrinding site of the 1st flotation of Crushing and Beneficiating Factory No. 2 to the tailings of Crushing and Beneficiating Factory No. 1.

Final Documents

01.2019

06.2019

Northern GOK PJSC. Increasing the iron content in the concentrate using flotation finishing technology at Severny Mining PJSC in order to achieve a mass fraction of total iron in magnetite concentrate of at least 69.0%.

Feasibility Study

01.2019

09.2019

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Installation of a pendulum beam on a drum pelletizer.

Detail Engineering

10.2018

11.2018

Ferrexpo Poltava Mining PJSC. Technical re-equipment of the magnetic separation stage at the technological sections of Ore and Beneficiating Factory No. 1.

Feasibility Study

01.2019

06.2019

Central GOK PJSC. Reconstruction of DRI pellet concentrate production line.

Basic Engineering and Final Documents

09.2018

04.2019

Northern GOK PJSC. Updating the design documentation of the Ore and Beneficiating Factory No. 1.

Basic Engineering

10.2018

04.2019

Northern GOK PJSC. Software development for calculating the material stock of charge materials in the manufacture of pellets for roasting machines.

Scientific Research

09.2018

11.2018

Ferrexpo Poltava Mining PJSC. Building of Press Filter Сonstruction. Transfer of drainage pumps from the press filtration construction area.

Final Documents

08.2018

11.2018

Central GOK PJSC. Pelletizing Factory. Installing a SCARABAEUS 7500 Peletizing Disc instead of an existing pelletizer on line No. 74.

Detail Engineering

07.2018

09.2018

Central GOK PJSC. Pelletizing Factory. Reconstruction of the sorting site for roasting pellets in order to exclude the +16.0 mm class from finished pellets.

Detail Engineering

06.2018

08.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Technological line No. 2. Installation of a leveling wall with the replacement of the smoke exhaust and its piping.

Detail Engineering

05.2018

07.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Technological line No.1. Reconstruction in order to increase productivity from 3.0 to 6.5 million tons/year for finished pellets.

Feasibility Study

08.2018

02.2019

Ferrexpo Poltava Mining PJSC. 9th section. Power supply 6 kV.

Check Final Documents

05.2018

08.2018

Ingulets GOK PJSC. Crushing Factory. Site 3-4 stages of crushing. Reconstruction of the lubrication area.

Detail Engineering

04.2018

09.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Building of Press Filter Сonstruction. Calculation of short circuit currents and settings.

Detail Engineering

04.2018

06.2018

Kryvyi Rih International Airport. Installation of block Complete Transformer Substation.

Detail Engineering

01.2018

03.2018

Lebedinsky GOK JSC. Pelletizing Factory. Roasting case No. 2. Reconstruction of the system of flow-transport system of roasting machines.

Author's supervision, Final Documents

01.2018

10.2018

RUDOMAIN LLC (Kryvyi Rih). Development of technological regulations for the beneficiation of hematite quartzites of the mine named after Kirov (mine field named after Artyom) using dry magnetic separation technology to obtain marketable products at facilities located at ul. Dzhambula, 33/1 and st. Ionova Balka, 15/a2.

Laboratory research, Scientific Research

12.2017

02.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Reconstruction of the pelletizing site to ensure the implementation of Industrial research of a Pelletizing Disc with a diameter of 7.5 m.

Predesign Study

12.2017

01.2018

Ferrexpo Poltava Mining PJSC. Laboratory and pilot tests for pelletizing "Premium" and "Premium+" concentrates at the HAVER Engineering GmbH research laboratory.

Scientific Research

04.2018

08.2018

Regional communal manufacturing enterprise "Dnipro-Kirovograd". Reconstruction of sewer pumping (20 objects)

Basic Engineering and Final Documents. Author's supervision

11.2017

10.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Development of technological regulations for the beneficiation of substandard ores of the Krivoy Rog iron ore basin.

Feasibility Study, Basic Engineering and Final Documents

09.2017

09.2018

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Technological line No. 1. Installation of an additional crane.

Predesign Study

07.2017

07.2017

Ferrexpo Poltava Mining PJSC. Pelletizing Factory. Technological line No. 1 and No. 4. Reconstruction of the pelletizing site in order to increase productivity up to 6.5 million tons/year for finished pellets.

Predesign Study

06.2017

06.2017

Shimanovskoye Steel LLC. Analytical review of the possibility of processing ores of the Shimanovsky deposit at the mining and mining plants of Ukraine.

Scientific Research

04.2017

04.2017

Ferrexpo Poltava Mining PJSC. Beneficiating Factory No. 2. Construction section No.16. Productivity 5.6 million tons/year for source ore.

Development of the technological task, Feasibility Study

03.2017

10.2017

RUDOMAIN LLC (Kryvyi Rih). Development of technological regulations for the processing of substandard ores of the Krivoy Rog iron ore basin.

Scientific Research

02.2017

02.2017

KMAruda Combine OJSC (Russia). Development of technology for the beneficiation of magnetite quartzite. Construction of a Beneficiating Factory with a productivity of 7.0 million tons/year for source ore.

Prefeasibility Study, 3D model in two versions

10.2016

02.2017

Boryspil International Airport State Enterprise. Reconstruction of tank RVS-1000 No. 1,2,3 and RVS-2000 No. 4,5

Author's supervision

09.2016

12.2016

"Sokolovsko-Sarbaisky mining and processing production association" OJSC (Kazakhstan). Development of technology and technological solutions for the reconstruction of a Beneficiating Factory with a productivity of 45 million tons/year.

Prefeasibility Study, 3D model

08.2016

10.2016

Atlas Copco LLC. Reconstruction of the workshop with the installation of a crane beam with a payload of 16 tonns

Detail Engineering

03.2016

05.2016